Viewing 18 results ...

Brosque, C, Skeie, G and Fischer, M (2021) Comparative Analysis of Manual and Robotic Concrete Drilling for Installation Hangers. Journal of Construction Engineering and Management, 147(03).

BuHamdan, S, Duncheva, T and Alwisy, A (2021) Developing a BIM and Simulation-Based Hazard Assessment and Visualization Framework for CLT Construction Design. Journal of Construction Engineering and Management, 147(03).

Cherkos, F D and Jha, K N (2021) Drivers of Road Sector Public-Private Partnership Adoption in New and Inexperienced Markets. Journal of Construction Engineering and Management, 147(03).

Dias Barkokebas, R and Li, X (2021) Use of Virtual Reality to Assess the Ergonomic Risk of Industrialized Construction Tasks. Journal of Construction Engineering and Management, 147(03).

El Sayed, A Y, Darwish, M and Nassar, K (2021) Design and Constructability of Novel Extendable Arched Steel Truss Falsework. Journal of Construction Engineering and Management, 147(03).

Hamledari, H, Sajedi, S, McCabe, B and Fischer, M (2021) Automation of Inspection Mission Planning Using 4D BIMs and in Support of Unmanned Aerial Vehicle–Based Data Collection. Journal of Construction Engineering and Management, 147(03).

Kar, S and Jha, K N (2021) Investigation into Lead Time of Construction Materials and Influencing Factors. Journal of Construction Engineering and Management, 147(03).

Katsuragawa, C M, Lucko, G, Isaac, S and Su, Y (2021) Fuzzy Linear and Repetitive Scheduling for Construction Projects. Journal of Construction Engineering and Management, 147(03).

Kim, K and Cho, Y K (2021) Automatic Recognition of Workers’ Motions in Highway Construction by Using Motion Sensors and Long Short-Term Memory Networks. Journal of Construction Engineering and Management, 147(03).

Liu, Y, Jarvamardi, A, Zhang, Y, Liu, M, Hsiang, S M, Yang, S, Yu, X and Jiang, Z (2021) Comparative Study on Perception of Causes for Construction Task Delay in China and the United States. Journal of Construction Engineering and Management, 147(03).

Ma, G, Jia, J, Ding, J, Wu, M and Wang, D (2021) Examining the Impact of Social Media Use on Project Management Performance: Evidence from Construction Projects in China. Journal of Construction Engineering and Management, 147(03).

Mahdavian, A, Shojaei, A, Salem, M, Yuan, J S and Oloufa, A A (2021) Data-Driven Predictive Modeling of Highway Construction Cost Items. Journal of Construction Engineering and Management, 147(03).

O’Connor, J T, Shrestha, B K, Winkler, M and Ouk Choi, J (2021) Relationship between Commissioning and Start-Up Success Factors Achievement and Performance in Capital Projects. Journal of Construction Engineering and Management, 147(03).

Raymond, A J, Kendall, A, DeJong, J T, Kavazanjian, E, Woolley, M A and Martin, K K (2021) Life Cycle Sustainability Assessment of Fugitive Dust Control Methods. Journal of Construction Engineering and Management, 147(03).

Shirowzhan, S, Sepasgozar, S M E and Trinder, J (2021) Developing Metrics for Quantifying Buildings’ 3D Compactness and Visualizing Point Cloud Data on a Web-Based App and Dashboard. Journal of Construction Engineering and Management, 147(03).

Yoon, S, Weidner, T and Hastak, M (2021) Total-Package-Prioritization Mitigation Strategy for Deferred Maintenance of a Campus-Sized Institution. Journal of Construction Engineering and Management, 147(03).

Zhang, S, Jiang, P, Zhang, Z and Wang, C (2021) WebGIS-Based Collaborative Construction Quality Control of RCC Gravity Dam Using Sensing Devices. Journal of Construction Engineering and Management, 147(03).

  • Type: Journal Article
  • Keywords: Roller compacted concrete (RCC) gravity dam; Construction quality control; Internet of things (IOT); WebGIS; Voxelization;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001994
  • Abstract:
    In recent years, information technology has been widely used in the construction quality control of hydropower stations, and a series of construction management systems based on the internet of things (IOT) have been produced. However, the existing systems are usually aimed at specific construction quality control factors, leading to the independence of all kinds of monitoring information, which also makes it impossible to directly evaluate the causes of quality problems after they occur. Manual multifactor analysis and evaluation are still needed. Based on a roller compacted concrete (RCC) gravity dam as an example, the construction quality control method is achieved by using WebGIS technology, image recognition technology, voxelization technology, and data mining analysis, which can quickly evaluate the causes of quality problems and integrate all kinds of monitoring information of different orders of magnitude into a presentation scene. This method makes the project quality management process more effective and cooperative. This study contributes to the existing body of knowledge of the quality control method based on informatization in construction.

Zuniga-Garcia, N, Machemehl, R B, Khwaja, N A, Pruner, K D and Fu, M (2021) Estimation of Road User Costs for Work Zones in Data-Limited or Time-Constrained Environments. Journal of Construction Engineering and Management, 147(03).